This is a cache of https://www.uibk.ac.at/en/energy-efficient-building/news/press-conference-on-the-conclusion-of-the-sinfonia-project/. It is a snapshot of the page at 2025-04-19T05:00:55.622+0200.
Press conference on the conclusion of the SINFONIA project – Universität Innsbruck
SINFONIA_Zertifikats-Uebergabe_221130_Foto-PHI_IMG_6865

SINFONIA press conference project finalisation

Press con­fer­ence on the con­clu­sion of the SIN­FO­NIA project

The refurbishment of the residential buildings was carried out step by step and in an inhabited state. Measurements by the University of Innsbruck and the evaluation by the Passive House Institute show that the heating requirements of the renovated buildings have already been reduced by around 77 per cent. Savings of up to 85 per cent are possible. Download the final report.

Laszlo Lepp from the Passive House Institute (centre back) handed over the 13 certificates and the final monitoring report for the refurbished buildings to the two property developers on 30.11.22. Also in the picture: Franz Danler (left), Innsbr. Immobiliengesellschaft, Mayor Georg Willi (2nd from left), markus Pollo (4th from right), Neue Heimat Tirol and Wolfgang Streicher (5th from left) & Rainer Pfluger (right) of UIBK.

Nach oben scrollen